Projects > Underground Structures > Anilion Tunnel, Egnatia Odos
Anilion Tunnel, Egnatia Odos
Anilion Tunnel, Egnatia Odos
Structural Design of the final lining of twin road tunnel with three cross passages, two cross overs and two lay-bys per branch. The right branch is 2.202m. long, the left branch is 2.152m. long while the maximum net width of the cross section is 11m. The tunnel excavated by NATM, while Cut & Cover method was used for the construction of the portals
Headquarters: Vassileos Georgiou 2-4 (3rd floor), 151 22 Maroussi, Athens, Greece, t. +30 210 300 5555, f. +30 210 300 5560, e. info@dencopc.gr |